Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 7 results ...
Habibi, M and Kermanshachi, S (2018) Phase-based analysis of key cost and schedule performance causes and preventive strategies. Engineering, Construction and Architectural Management, 25(08), 1009–33.
Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(08), 1034–52.
Jacobsson, M and Merschbrock, C (2018) BIM coordinators: a review. Engineering, Construction and Architectural Management, 25(08), 989–1008.
Meng, J, Yan, J, Xue, B, Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(08), 1092–108.
Rohani, M, Shafabakhsh, G, Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(08), 1053–74.
Sawan, R, Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(08), 974–88.
Sepasgozar, S M, Davis, S, Loosemore, M and Bernold, L (2018) An investigation of modern building equipment technology adoption in the Australian construction industry. Engineering, Construction and Architectural Management, 25(08), 1075–91.